Safe Work Method Statement Template
How a job will be done safely, written down before it starts.
Safe work method statements set out how a particular job will be done safely. It lists the steps involved, the hazards attached to each step, and the controls that will be used to deal with them.
For a body corporate the relevance is contractors. Roof work, confined space entry, work near live electrical equipment and work at height on common property all carry risk, and the scheme has a duty to satisfy itself that the people doing that work have thought it through.
When a committee should ask for one
Any time a contractor is engaged for work that is not routine. Window cleaning on a tower, gutter work, pump room maintenance, tree lopping over a driveway, anything off a ladder, and anything at height.
Asking for the statement before work starts is the point. Received afterwards it is paperwork; received beforehand it is a conversation about whether the method is actually safe.
How to use this template
Download it, send it to the contractor, and read what comes back. A statement that describes the hazards of the job in specific terms is worth having. One that could apply to any job on any site has not been thought about.
Treat it as a starting point rather than a compliance tick. What your scheme actually needs depends on the work, the building, and the arrangements already in place.
Where this sits in a WHS audit
Contractor management is one of the things a work health and safety audit looks at. If the committee cannot produce method statements for the contractors working on common property, that is a gap the audit will record.
Download
Free to use. Right click and save, or open it in a new tab.
More free material for committees and strata managers is on our resources page. If you want the underlying obligation assessed properly rather than self managed, we carry out work health and safety audits for bodies corporate. Call 07 5573 4011.